Skunk Works
The board
Skunk Works → Board shows the sprint that is running, in four columns: To Do, In Progress, In Review and Done. Above it are the sprint's name, its end date, and how many of its points are done.
Watch the video
Skunk Works: Moving Work Through the Board1:49 video- Drag a card to another column as the work moves on, or up and down within a column.
- Dragging a card to Done marks the item done. Dragging it out of Done reopens it.
- The ⋯ button on a card moves it without dragging (for a touch screen or a keyboard), opens it, or sends it back to the backlog (a card in Done stays in the sprint).
- Click a card to open the item.
Complete it in the Backlog, beside the sprint's points, takes you to the Backlog, where Complete sprint finishes the sprint and moves its unfinished work.
When no sprint is running, the board says so. Plan one in the Backlog and click Start sprint.
A card shows the item's key, priority, points, title, epic, labels, due date and who it is assigned to. An overdue date is shown in red.
Signed in to VeraGen? Press Guide me on any screen for a walkthrough, or ask Odin.